Categories

PUBLICATION OF A FINAL PRELIMINARY DOCUMENTATION

Everleigh Solar Park Project, Queensland (EPBC 2022/09339)

Publication of final Preliminary Documentation under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) pursuant to Section 95B.

Everleigh Solar Park Pty Ltd is seeking approval under the EPBC Act to construct a solar park facility, a transmission line and associated infrastructure at 148 Clynes and Kogan-Condamine Roads, Crossroads, Queensland (EPBC 2022/09339).

The proposed development was determined a controlled action under the EPBC Act with assessment by Preliminary Documentation. The controlling provisions are listed threatened species and communities (Sections 18 and 18A of the EPBC Act), namely the Koala (Phascolarctos cinereus).

The Final Preliminary Documentation is available for information at the following locations:

  • State Library of Queensland, John Oxley Library (Level 4): Stanley Place, South Brisbane
  • Western Downs Chinchilla Library, 27 Bell St, Chinchilla QLD 4413
  • Online at:https://dpigroup.org/news/

The final Preliminary Documentation is available for viewing for 10 business days from 28th of August 2023 until 8th September 2023.

Persons with special needs (e.g. for whom English is a second language or who have a vision impairment) may contact Ausecology for assistance via info@ausecology.com or on (07) 3397 4695.

Downloads:

000_Preliminary Documentation EPBC 2022 09339

001_EPBC referral application_submitted_26.08.2022

Att 1-Everleigh-EcologyReport_Rev0sml

Att 2 -ASLAT Quality Policy 2018

Att 3- References

Att. 4 CHMP_Crossroads solar parks

Att. 5 Traffic Impact Assessment

Att. 6 Cultural Heritage Desktop Report

Att. 7 Everleigh Solar Park Project QLD (EPBC 202209339) _ PublicSubmissions

Next Post
DPI expands portfolio with investment in Green Li-on